NULORA / WORKING TOGETHER

Your next product. A shared commitment.

From an existing model to a new design, we can connect design support, shared tooling investment and a clear commercial agreement around your project.

See how cooperation can work
S10 concept sketch visualisation for product design discussion
S10 / Concept sketch visualisationDevelopment project
01 / CHOOSE A STARTING POINT

An existing platform, or a new direction.

KZ-001 current model in a travel-packing design visualisation
KZ-001CURRENT MODEL
CURRENT MODELS

KZ-001 · MRS-001

Discuss sourcing, colour, logo and packaging options for an existing product. The selected configuration, sample and order requirements are agreed together.

Overseas projects can enquire about current-model cooperation for KZ-001 and MRS-001.

Explore a current model
Compact T10 design visualisation in a travel packing scene, a development project
T10DEVELOPMENT DESIGN
JOINT DEVELOPMENT

S10 · T10 · X20 · D10

Explore a development design or bring a new product brief. We can work with Hong Kong design partners on the agreed appearance and structural optimisation scope.

These four designs are development projects and have not yet reached tooling. Configuration and performance require engineering and prototype validation.

Explore a development design
CUSTOMER-EXCLUSIVE PRODUCTION CASES

Production references. A closer look.

F10 with its three-part exterior, textured middle and translucent base

F10

A three-part exterior with fine texture and a translucent base.

Explore the case

Both are customer-exclusive models in production. China sales are available. Overseas, they demonstrate design and manufacturing capability only and are not available for existing-model orders, private label or distribution. Overseas projects can discuss a separate new design.

NULORA / PACKAGING FOR YOUR BRAND

From product, to your brand presentation.

Packaging can be developed around the selected model and your brand. Discuss the box, insert, logo and instruction card as part of the project.

T10 warm white packaging concept with pump, box, insert, cable and instruction card
T10 / Warm whitePACKAGING CONCEPT
T10 graphite packaging concept with pump, box, insert, cable and instruction card
T10 / GraphitePACKAGING CONCEPT

T10 packaging concepts shown for illustration. Actual accessories and the final supplied contents are confirmed separately for the selected model and project.

02 / DESIGN SUPPORT & TOOLING

Share the work. Define the investment.

A cooperation structure can be built around the actual development scope and a purchase plan agreed by both parties.

DESIGN COLLABORATION

A shared view of the product.

Use the agreed brief, design views and model review to discuss form and structural refinements with our Hong Kong design partners.

D10 / CAD geometry · development project
D10 isometric view rendered from its CAD model
FORM REVIEW
D10 CAD top view
TOP VIEW
D10 CAD right view
SIDE VIEW
01

Design refinement, supported by us.

NULORA can bear the cost of agreed product design, refinements and optimisation, working with our Hong Kong design partners. Covered work and deliverables are defined in the proposal.

AGREED DESIGN SCOPE
02

Actual tooling costs, shared.

For example, the customer and NULORA can each contribute half of the agreed tooling cost. The final split, tooling scope and payment stages are recorded in the project agreement.

NULORA 50%Customer 50%EXAMPLE · AGREED BY PROJECT
03

Purchase volume can unlock a tooling refund.

Once qualifying cumulative purchases reach the agreed quantity, the customer’s agreed tooling contribution can be refunded under the contract. The qualifying volume, amount, timing and refund method are defined in advance.

1Agree the threshold2Qualifying purchasesAgreed refund

These are available cooperation options. Each proposal confirms the scope of design, samples, tooling, engineering and testing work, together with the items and responsibilities covered by each party.

03 / COMMERCIAL SCOPE & PROJECT RIGHTS

Make the arrangement clear from the start.

EXCLUSIVE SUPPLY

A product arrangement for your market.

For a selected model or joint project, exclusive supply can be discussed alongside agreed purchasing commitments.

  • Product and configuration
  • Territory, channels and term
  • Purchase commitments and responsibilities
INTELLECTUAL PROPERTY

Ownership, licensing or agreed transfer.

We can negotiate the ownership, licensing or transfer of project-related rights to the customer, with the relevant rights and conditions identified in the agreement.

  • Existing rights and new project results
  • The rights and documents involved
  • Transfer scope, conditions and timing
04 / A CLEAR PROJECT PATH

Agree the brief. Move forward together.

The next step is agreed for your project. Development milestones are reviewed against the selected model and actual progress.

  1. MRS-001 product reference
    01

    Share your brief

    Target market, preferred model, product changes and purchasing plan.

  2. S10 concept sketch visualisation
    02

    Review the scope

    Design support, samples, engineering, tooling and the expected deliverables.

  3. 03

    Record the agreement

    Cost sharing, refund terms, purchase commitments, exclusivity and project rights.

  4. D10 front view from the CAD model
    04

    Confirm each stage

    Review the relevant design, sample and production requirements before moving on.

Illustrated with existing product and development materials. The review points and sequence are confirmed for each project.

05 / QUESTIONS BEFORE WE BEGIN

The details, made clearer.

01

Will we need to pay for design refinement?

For an agreed cooperation project, NULORA can cover the defined product design, refinement and optimisation work coordinated with our Hong Kong design partners. We confirm the covered work and deliverables in the project proposal, so both sides know the scope before starting.

02

How can tooling costs be shared?

Actual tooling costs can be shared between NULORA and the customer. The split, tooling scope, payment stages and responsibilities are agreed for the project rather than applied as a fixed condition to every enquiry.

03

Can our tooling contribution be refunded?

Yes, a project agreement can provide for the refund of the customer’s agreed tooling contribution once qualifying purchases reach the agreed volume. The threshold, qualifying orders, refund amount, timing and method are confirmed in writing before the arrangement begins.

04

Can we arrange exclusive supply?

Exclusive supply can be discussed for a specific model or jointly developed project. The agreement defines the product and configuration, territory, sales channels, term, purchase commitments and the responsibilities of each party.

05

Can project intellectual property be transferred to us?

Project-specific ownership, licensing or transfer arrangements can be negotiated. The agreement identifies the relevant rights and documents, distinguishes existing background rights from new project results, and records the agreed transfer scope and conditions.

06

What should we send to start a project?

Share your target market, preferred model or product idea, expected quantity and the changes you would like to make. We can then review design scope, samples, tooling, commercial arrangements and the next development steps together.

START WITH YOUR PRODUCT IDEA

Let’s define a project that works for both sides.

Tell us your model, market and purchasing plan. We will review the cooperation scope with you.

Discuss joint development
NULORA / PUMP DESIGN RIGHTS

Original designs. Rights reserved.

Patent and intellectual property protection measures cover the listed pump designs.

M10 and F10 are customer-exclusive cases: China sales only; overseas showcase only.

Rights & market scope
  • M10
  • KZ-001
  • MRS-001
  • S10
  • T10
  • X20
  • D10

NULORA has taken patent and intellectual property protection measures for the models listed above, including relevant exterior and structural designs. Without the rights holder’s written permission, copying or imitating protected designs, or using them for commercial manufacture or sale, is prohibited.

M10 and F10 are customer-exclusive production cases. Overseas, both are displayed as capability references only and are not available for existing-model orders, private label or distribution. M10 is freely available for sale in China. F10 design use and supply remain subject to the customer arrangement, with no third-party reproduction; domestic sales may be discussed. Overseas partners can discuss a separate new design.

The type of rights, grant or application status, territory and scope are defined by the relevant documents. Joint development, licensing and ownership of project results are agreed in writing.

Discuss authorised collaboration
05 / LET’S BEGIN

Share your model, target market and project requirements. Not sure which model fits? We can help you choose.

EMAILrobin554098888@gmail.comWHATSAPPChat with Robin
Scan WhatsApp QR code
Robin’s WhatsApp contact QR code

Scan with WhatsApp, or use the chat link above.

Save QR code
PHONE+86 139 5748 8888

For product, sample and OEM enquiries, email or message us on WhatsApp. Please include your preferred model, target market and estimated quantity.

Samples · Private label · Joint development
/ PRODUCT FILM

Manufacturer demonstration. Results vary with bag size, contents, sealing and valve fit.

A closer comparison.

Model
Status
Function
Runtime reference
Market scope
Material
Dimensions
Battery
Input

Development figures are design references. KZ-001 and MRS-001 runtimes are cumulative references with approx. 2-min auto-off, not continuous operation; restart to continue. Confirm the selected configuration and samples before ordering.

Help me choose